{schedule}
March 24 (wed)
- have all of necessary data collected
- bathymetric/elevation
- breakline/surface
- wetland gradient
- salinity
- infrastructure: oil wells, pipes, refineries, roads
March 27 (sat)
- transfer data into autocade files
- cut scaled sections on laser cutter
- material testing/experimentation
March 31 (wed)
- construction of larger model framework
- scaled material exploration with connection pieces/structure
- story board of experience animation
- print out large site map
April 14 (wed)
- collect images to animate
- refine large scale prototype mock up
April 21( wed)
- rough draft of animation
- large scale prototype revisions
April 28 (wed)
- revisions
May 5 (wed)
- model and animation due
