{schedule}

March 24 (wed)

- have all of necessary data collected

- bathymetric/elevation

- breakline/surface

- wetland gradient

- salinity

- infrastructure: oil wells, pipes, refineries, roads

March 27 (sat)

- transfer data into autocade files

- cut scaled sections on laser cutter

- material testing/experimentation

March 31 (wed)

- construction of larger model framework

- scaled material exploration with connection pieces/structure

- story board of experience animation

- print out large site map


April 14 (wed)

- collect images to animate

- refine large scale prototype mock up


April 21( wed)

- rough draft of animation

- large scale prototype revisions

April 28 (wed)

- revisions

May 5 (wed)

- model and animation due



Leave a Reply

You must be logged in to post a comment.