{schedule}

March 24 (wed)

– have all of necessary data collected

– bathymetric/elevation

– breakline/surface

– wetland gradient

– salinity

– infrastructure: oil wells, pipes, refineries, roads

March 27 (sat)

– transfer data into autocade files

– cut scaled sections on laser cutter

– material testing/experimentation

March 31 (wed)

– construction of larger model framework

– scaled material exploration with connection pieces/structure

– story board of experience animation

– print out large site map


April 14 (wed)

– collect images to animate

– refine large scale prototype mock up


April 21( wed)

– rough draft of animation

– large scale prototype revisions

April 28 (wed)

– revisions

May 5 (wed)

– model and animation due



Leave a Reply

You must be logged in to post a comment.