{schedule}
March 24 (wed)
– have all of necessary data collected
– bathymetric/elevation
– breakline/surface
– wetland gradient
– salinity
– infrastructure: oil wells, pipes, refineries, roads
March 27 (sat)
– transfer data into autocade files
– cut scaled sections on laser cutter
– material testing/experimentation
March 31 (wed)
– construction of larger model framework
– scaled material exploration with connection pieces/structure
– story board of experience animation
– print out large site map
April 14 (wed)
– collect images to animate
– refine large scale prototype mock up
April 21( wed)
– rough draft of animation
– large scale prototype revisions
April 28 (wed)
– revisions
May 5 (wed)
– model and animation due